Vaughan’s construction scene is massive. Woodbridge developments, Maple estates, Concord high-rises, Kleinburg luxury homes – different projects, same need for reliable painting crews who deliver quality work on schedule.Paint Lions provides custom home painting across Vaughan’s building sites. Builders and homeowners hire us when deadlines matter and quality can’t slip. We integrate with construction schedules, maintain clean sites, produce finishes that satisfy final walkthroughs.New construction exposed our painters to every scenario. Raw drywall needs methodical priming, detailed trim work requires patience and skill, wall finishes depend on proper surface prep. Using quality products correctly makes the difference between callbacks and satisfied clients.

custom home painting vaughan

The Three Stages of Custom Home Painting

Custom builds aren’t like refreshing occupied properties. Everything changes – the timeline shifts, challenges increase, coordination becomes essential. We don’t just appear on day one applying coats immediately. We synchronize with builders, work around carpenters, coordinate with tapers and others. Our tested approach consistently yields professional outcomes. Here’s our full process from start to completion:

  • Drywall Priming
  • Initial Painting
  • Paint Touch Ups
drywall priming vaughan

Drywall Priming

Following drywall completion, we begin priming operations. Ceilings receive spray coating plus backrolling for consistent coverage. Walls only get rolled – no spray application. The logic? Active construction creates constant dust. Sprayed walls collect airborne particles, feeling gritty afterward. Rolling method produces cleaner outcomes, works faster, needs minimal masking prep. Best trade-off between efficiency and surface quality.

spray painting vaughan

Initial Painting

Initial painting begins once tiles are laid and carpentry is finished. Ideal conditions include completed flooring, installed vanities, mounted cabinets. This order protects new paint from subsequent trade damage. Work areas need clearing – tools put away, materials stored elsewhere, workers off-site. Basic site cleaning should precede our start.

Initial painting encompasses four stages – prep work, spray coating, wall application, and complete cleanup operations.

Preparations

All nail holes receive filling, damaged trim and doors get repaired. We fill hundreds of cracks where walls meet woodwork. Protection goes up over tiles, windows, floor surfaces to prevent overspray. Rushing preparation compromises results.

Spray Painting

Primer gets sprayed on all woodwork, then sanded perfectly smooth. Another primer layer follows, then additional sanding. Two topcoats complete the system, sanding occurs between applications. Four complete rounds deliver glass-smooth trim. Complete door coverage includes both faces and every edge.

Walls Painting, and Clean-Up

Walls get light sanding before first rolled application. Second coat follows, then final sanding for smooth results. All masking comes down, windows and floors get thorough cleaning. Feature walls and color breaks show clean lines without any bleeding.

custom home interior vaughan

Paint Touch Ups

Once remaining trades complete work – plumbing, electrical, countertop installation – we return for touch-ups. We correct any damage they created. Typically needs 2-4 days depending on trade count and their attention to detail.

Scuffed walls get attention, scratched trim receives fixes, damaged spots get recoated. Stair staining works perfectly now with traffic eliminated. Final review with homeowner or builder ensures complete satisfaction.

Getting Started

Looking for a quote on your custom home painting project?

Just visit our contact form and send us your drawings along with any specific details. That’s usually enough for us to give you a basic price estimate. Or if you’d prefer to meet in person, that works too, just let us know!

Looking forward to hearing from you!

FAQs

Yes. Vaughan’s construction volume is huge – we run multiple crews across Woodbridge, Maple, Concord, and Kleinburg simultaneously. Each crew maintains the same quality standards. Scale doesn’t compromise our attention to detail.

Both. Production builders need speed and consistency – we deliver. Custom builders need flexibility and premium finishes – we provide that too. Vaughan has every type of builder. We adapt to each one’s requirements.

Fast. Vaughan projects move quickly. We schedule crews 1-2 weeks ahead but can accelerate if your timeline demands it. Large team means flexibility – we shift resources when builders need urgent starts.

High-rises require logistics planning – material hoisting, elevator scheduling, parking coordination. We’ve painted dozens of Concord towers. Understanding building management protocols and condo corporation rules is second nature to us.

Reliability. We show up on schedule, finish on time, and pass inspections first try. Vaughan builders can’t afford delays – their timelines are tight. We’ve earned repeat business by never letting them down.

Recent Custom Home Painting Projects